We were retained to provide fall scenario engineering analyses, as well as to provide detailed fall protection procedures, system drawings and working manuals for the Terra Nova.
This involved documentation for 57 priority access points on the vessel, including initial entry / access and specified fall protection procedures and equipment for confined spaces such as storage tanks, ballast tanks, oil service tanks, etc.